BTS3 will largely build on the current setup, with enhancements designed to support future performance and scalability needs.
Infrastructure and connectivity
- BTS3 will continue to be hosted on-premise, consistent with today’s setup
- Participants will connect via Bursa Malaysia’s existing network arrangements (SD-WAN)
- Bandwidth and network upgrade requirements, if any, will be confirmed after the Design Study phase
- Decisions on Point-of-Presence (POP) will also be reviewed during system design
System specifications and planning
- The Design Study is scheduled from June to September 2026
- Message specifications are expected by September 2026, allowing participants to plan development effort and budget early
Drop-copy format
- Any changes to Bursa Malaysia’s drop-copy file format will be clearly outlined in the Technical Specifications
- Participants will be informed in advance to support any required updates
All updates and detailed documentation will be shared via the BTS3 microsite to keep participants informed throughout the process.