The BTS3 migration consists of the following phases:
- Design Study
- Development
- User Acceptance Testing (UAT)
- Member Conformance Testing
- External User Acceptance Testing (EUAT)
- Industry-Wide Testing (IWT)
- Pre-Live Testing
- Go-Live
This phased approach ensures that the system is thoroughly developed, tested, and validated before implementation.